Latest issueSurfliner trains are cut off at Oceanside after king tides damage the tracksRead now

← Oceanside news

Getting AroundTuesday, November 10

Trains are now rolling across the new Batiquitos Lagoon bridge

The Daily Oceanside teamFrom the Nov. 10 edition · 1 min read · 2 sources

ShareEmailFacebookX

If you ride the Coaster or Surfliner through Carlsbad, this one's for you. An Amtrak Surfliner made the first run across the new rail bridge Monday morning, a milestone for the double-tracking project.

The Batiquitos Lagoon double-tracking project by the numbers

$166 million
for the double-tracking project
75%
of the project is complete
0.6 mile
of second track is being added
5.7 miles
of double track once it's done

's Omar Atayee said double track lets you run multiple trains at the same time and lets crews take one track out of service for maintenance. Caltrans' Tracey D'Aoust-Roberts said the wider channel lets more tidal water through, which helps eelgrass grow. She said that encourages fish and brings in suitable habitat for the endangered .

  • Where: La Costa Ave. in Encinitas to Avenida Encinas in Carlsbad
  • Replaces: a wooden trestle from the 1940s
  • Next: remove the old trestle and build the parallel bridge

The bridge project runs from 2024 to 2028

  1. 2024Construction begins on the double-tracking project.
  2. Nov. 9An Amtrak Surfliner makes the first run over the new bridge.
  3. 2028The project is expected to finish, and the old bridge to be removed.

Sources: KPBS Public Media, FOX 5 San Diego & KUSI News

Read it in the full edition

More from the Nov. 10 edition

Read the edition
All getting around news
  1. Laguna Niguel Patch9 hours ago

    Massive 8.5-Foot King Tides Trigger Flooding, PCH And Rail Closures, on Laguna Niguel Patch

    Water levels are expected to reach up to 8.5 feet in Orange County, prompting another slew of road and rail closures and flooding.

  2. edhat11 hours ago

    Pacific Surfliner Cancels Trains, Changes Routes After High Tides Damage Tracks in San Clemente, on edhat

    Pacific Surfliner train services have been facing significant disruptions after high tides caused damage to rail tracks, forcing the suspension of train operations between Irvine and Oceanside stations. The exceptionally

    Also reported byNBC Los AngelesSanDiegoRedLa OpiniónFOX 11 Los Angelesand 2 more

  3. CBS News 823 hours ago

    Surfliner trains suspended between Oceanside and Irvine as crews repair washed-out tracks, on CBS News 8

    Amtrak estimates that repairs in San Clemente will continue into Friday, when they will provide bus bridges.

  4. NBC 7 San DiegoYesterday

    King tides pummel Oceanside coastline, on NBC 7 San Diego

    The king tides pushed their way across the north county coast line forcing thousands of runners into a Thanksgiving Day detour. There was also some coastal…